Please list below any damaged, incomplete, or missing items and anything that is not in good operating condition. Also note any (substitutions) of items referred to in, or to be selected under, the Agreement of Purchase and Sales (APS). Please initial all changes and deletions. As a minimum, check the following:

DAMAGED, INCOMPLETE OR MISSING
  • Windows, side lights and other glazing. Window and door screens
  • Bathtub sinks and toilets
  • Bathroom accessories if provided
  • Mirrors, counter tops and cabinetry
  • Flooring (hardwood, vinyl, ceramic tiles, carpeting)
  • Interior finished and trim carpentry
  • Furnace
  • Hot water heater, if provided (not rental)
  • Exterior finished, driveways, walkways, decks and landscaping
OPERATING CONDITION
  • Windows, interior and exterior doors. Door locks
  • Faucets: Kitchen, bathroom, laundry room
  • Exhaust fans (kitchen, bathrooms) if provided
  • Electrical outlets and fixtures
  • Gas fireplaces, incl.circulation fans, if provided
  • Heat Recovery Ventilation system, if provided
  • Heating system
  • Hot water heater, if provided (not rental)
  • Air conditioning system, if provided and if conditions permit
THROUGHOUT
OTHER DAP THROUGHOUT THE HOUSE _________ _________
REMOVE PLASTIC COVERS FROM SMOKE AND CARBON MONOXIDE DETECTORS THROUGHOUT THE HOUSE _________ _________
INSTALL FLOOR REGISTERS THROUGHOUT THE HOUSE _________ _________
INSTALL BLANK COVER PLATES THROUGHOUT THE HOUSE _________ _________
REPAIR DRYWALL AS TAGGED THROUGHOUT THE HOUSE _________ _________
REPAIR TRIM AS TAGGED THROUGHOUT THE HOUSE _________ _________
DAP STRINGERS TO WALLS THROUGHOUT THE HOUSE _________ _________
DAP COUNTERTOPS TO WALLS THROUGHOUT THE BATHROOMS _________ _________
REPAIR OVER CUT AT BACK OF CABINETS UNDER SINKS THROUGHOUT THE BATHROOMS _________ _________
SILICONE SINKS TO COUNTERTOPS THROUGHOUT THE BATHROOMS _________ _________
SILICONE TOE TESTERS THROUGHOUT THE BATHROOMS _________ _________
DAP TILES IN SHOWER AND TUB ENCLOSURES TO CEILING THROUGHOUT THE BATHROOMS _________ _________
PAINT TOUCH UPS THROUGHOUT THE HOUSE _________ _________
PAINT BACK OF CABINETS UNDER SINKS THROUGHOUT THE BATHROOMS _________ _________
DAP MARBLE JAMBS TO WALLS THROUGHOUT THE BATHROOMS _________ _________
CLEAN J MOLD AND SEAL TO WALLS THROUGHOUT THE BATHROOMS _________ _________
HARDWOOD FLOORS COVERED THROUGHOUT THE HOUSE _________ _________
STAIRS COVERED THROUGHOUT THE HOUSE _________ _________
WINDOWS NOT CLEAN THROUGHOUT THE HOUSE INTERIOR AND EXTERIOR _________ _________
TUBS AND SHOWERS COVERED/NOT CLEAN THROUGHOUT THE BATHROOMS _________ _________
CABINETS, COUNTERTOPS, SINKS, TILES, MIRRORS, CARPETS, COVERED/NOT CLEAN THROUGHOUT THE HOUSE _________ _________
- THIS IS A TEST. DELETE WHEN DONE _________ _________
 
MASTER BEDROOM
DRYWALL REMOVE STIPPLE BLOBS FROM CEILING AROUND LIGHT FIXTURE ON RIGHT SIDE _________ _________
REPAIR GOUGES IN SMOOTH BORDER, ONE BY CLOSET DOOR ABOVE LEFT CORNER AND ONE AT CENTRE ABOVE EN-SUITE DOOR _________ _________
REPAIR MISSING DAP AND DRYWALL/TRIM AS TAGGED IN MASTER _________ _________
SUB-FLOORS FLOOR SQUEAKS IN MASTER _________ _________
WINDOW WINDOW SCREEN BENT IN MASTER _________ _________
MASTER BEDROOM CLOSET
DRYWALL STIPPLE BLOB IN CEILING ON RIGHT SIDE OF ATTIC DOOR _________ _________
REPAIR TAGS IN CLOSET DRYWALL/TRIM _________ _________
ATTIC
INSULATION CHECK/MEASURE ATTIC INSULATION _________ _________
MASTER ENSUITE
DRYWALL REPAIR OVER CUT AT EXHAUST FAN _________ _________
TOUCH UP DAP AS TAGGED AT BASEBOARD BY VANITY _________ _________
BEDROOM 2
HEATING/AIR CONDITIONING MISSING VENT COVER FOR COLD AIR RETURN _________ _________
DRYWALL REMOVE STIPPLE BLOBS FROM CEILING AROUND LIGHT FIXTURE AND BY COLD AIR RETURN _________ _________
GOUGE/MARK ? IN STIPPLE AT SMOOTH BORDER BY COLD AIR RETURN _________ _________
TOUCH UP AT TAGS WALL BEHIND DOOR AND TRIM _________ _________
SUB-FLOORS FLOOR SQUEAKS IN BEDROOM BY MASTER _________ _________
BEDROOM 2 CLOSET
DRYWALL TOUCH UP AS TAGGED LEFT SIDE OF CLOSET TWO TAGS _________ _________
ENSUITE 2
DRYWALL TOUCH UP SEVEN TAGS IN BATHROOM AND AT BATHROOM DOOR _________ _________
LAUNDRY ROOM
DRYWALL TOUCH UP TAGS AND REMOVE PAINT BLOBS AT CEILING _________ _________
BEDROOM 3
DRYWALL TOUCH UP AT TAGS BEHIND DOOR AROUND ROOM _________ _________
REMOVE STIPPLE BLOBS IN CEILING THROUGHOUT _________ _________
TOUCH UP AT SMOOTH BORDER AND STIPPLE JUST PAST COLD AIR RETURN ON LEFT SIDE OF ROOM _________ _________
CARPET FIX GAPS AT DOOR CASINGS TO SHARED BATHROOM _________ _________
BEDROOM 3 CLOSET
DRYWALL TOUCH UP DAP AS TAGGED IN CLOSET _________ _________
SHARED BATHROOM
DRYWALL TOUCH UP AT TAGS IN WATER CLOSET AND SHARED BATHROOM _________ _________
BEDROOM 4
DRYWALL TOUCH UP AREAS AS TAGGED _________ _________
 
STUDY ROOM
DRYWALL TOUCH UP SMOOTH BORDER AROUND WINDOW OPENING TO VAULTED CEILING???? _________ _________
TOUCH UP TAGS _________ _________
UPPER HALL
DRYWALL REMOVE STIPPLE BLOBS AT CEILING OVER OPEN AREA TO BELOW AND AROUND LIGHT FIXTURE BESIDE IT _________ _________
TOUCH UP AREAS AT TAGS _________ _________
MAIN STAIRS
INTERIOR RAILINGS TOUCH UP SCRATCHES AT HANDRAIL AND ON POST AT UPPER LEVEL _________ _________
TOUCH UP CHIP IN POST AT UPPER LEVEL CLOSE TO THE BOTTOM _________ _________
TOUCH UP SCRATCH AT POST ON LANDING TO UPSTAIRS AND STAIN AT TRIM LANDING _________ _________
DRYWALL REPAIR AS TAGGED DRYWALL AT STAIRS _________ _________
INTERIOR STAIRS STAIN TRIM AT BULL NOSING AT MAIN STAIR IN HALLWAY _________ _________
FOYER
ELECTRICAL MISSING COVER PLATES FOR ALARM ROUGH IN??? _________ _________
LIGHT IN CLOSET WON’T SHUT OFF WHEN BOTH DOORS ARE CLOSED _________ _________
DRYWALL REMOVE STIPPLE BLOB FROM CEILING BY LIGHT FIXTURE _________ _________
TOUCH UP AS TAGGED INSIDE MAIN CLOSET AS WELL _________ _________
MUD ROOM CLOSET
DRYWALL TOUCH UP TAGS IN CLOSET _________ _________
MUD ROOM
DRYWALL TOUCH UP AT TAGS _________ _________
POWDER ROOM
DRYWALL REPAIR OVER CUT AT EXHAUST FAN AND TOUCH UP AT TAGS _________ _________
DINING ROOM
DRYWALL TOUCH UP AREA AT TAGS _________ _________
GREAT ROOM
DRYWALL TOUCH UP AT TAGS _________ _________
REMOVE STIPPLE BLOBS FROM CEILING RIGHT OF LIGHT FIXTURE _________ _________
BREAKFAST
DOOR BLOCK PATIO DOOR TRACK DUE TO INCOMPLETE GRADING _________ _________
CERAMICS MISSING GROUT ALONG PATIO DOOR TO TILE _________ _________
KITCHEN
CABINETRY CHIP AT BOTTOM LEFT CORNER OF MICROWAVE SHELF _________ _________
CHIP CLOSE TO BOTTOM OF RIGHT SIDE FILLER STRIP AT FRIDGE OPENING _________ _________
CHIPS ALONG TOE KICK LEFT OF STOVE OPENING _________ _________
HOOD FAN ON COUNTERTOP COULDN’T INSPECT CABINETS TO RIGHT OF FRIDGE OPENING _________ _________
PLUMBING KITCHEN FAUCET NOT INSTALLED _________ _________
APPLIANCES HOOD FAN NOT INSTALLED _________ _________
CERAMICS BACKSPLASH NOT INSTALLED _________ _________
 
KITCHEN
ELECTRICAL SET POT LIGHTS IN KITCHEN FLUSH TO CEILING _________ _________
BASEMENT STAIRS
DRYWALL TOUCH UP AT TAGS _________ _________
UNFINISHED STORAGE ROOM
ELECTRICAL ELECTRICAL WIRES NOT INSTALLED FOR ENERGY MONITOR AT AMP PANEL _________ _________
ENERGY MONITOR AT AMP NOT INSTALLED _________ _________
FURNACE ROOM
OTHER INSTALL ALL TAGS AT WATER AND GAS SHUT OFF VALVES _________ _________
PLUG IN HRV _________ _________
COMPLETE FIRE STOPPING AT BASEMENT CEILING _________ _________
COMPLETE INSULATION AND VAPOUR BARRIER AT JOIST POCKETS _________ _________
GARAGE
OTHER INSTALL STEPS AT MAN DOOR _________ _________
COMPLETE GAS PROOFING _________ _________
LIGHT BULBS NEEDED FOR OVERHEAD LIGHTS _________ _________
EXTERIOR
ELECTRICAL SET DOOR BELL TO BRICK _________ _________
MISSING BULBS IN POT LIGHTS OVER THE GARAGE _________ _________
CAULKING INCOMPLETE CAULKING AROUND OUTLET ON FRONT PORCH AS WELL AS OUTLET AT PATIO DOOR AND LIGHT FIXTURE _________ _________
COMPLETE CAULKING AT END OF STUCCO MOLDING UPPER AND LOWER LEVEL _________ _________
MASONARY BRICK REPAIR AT BOTH SIDES UNDER DINING ROOM WINDOW AT RIGHT SIDE OF HOUSE _________ _________
BRICK REPAIR AT WATER TANK PIPE LEFT SIDE OF HOUSE _________ _________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
THE COMPLETED PRE-DELIVERY INSPECTION IS A FORMAL RECORD OF THE HOME'S CONDITION BEFORE THE PURCHASER TAKES POSSESSION IT WILL BE USED AS A REFERENCE FOR FUTURE WARRANTY REQUESTS.
* Purchasers or owners who intend to designate someone to conduct the PDI in their place should ensure they provide written authority to the vendor/builder authorizing the designate to sign this form on their behalf.

I have inspected my new home and I agree that the description of the items listed on this form are accurate.

MS. TIANSU SI
_____________________
Purchaser's Name (print)

_____________________
Purchaser's Signature
YU ZHANG
_____________________
Purchaser's Name (print)
_____________________
Purchaser's Signature
_____________________
Designate's Name (print)

_____________________
Designate's Signature

Lana Huys
_____________________
Inspector's Name (print)

_____________________
Inspector's Signature

Date (YYYY/MM/DD)

2019/10/28

October 28, 2019