From: Wendy Skyba [wendy@pratthomes.ca]
Sent: Monday, July 19, 2010 8:34 AM
To: Rudy Armellin
Cc: Lorraine Goyetche; Shaun Jalbert
Subject: Re:
Hi Rudy,
I will give the signed Release to Shaun. He will sign for Pratt & get a copy back to you.
I will ask Teresa to contact you today to book our service man to take care of your list. Some items will have to be sent to the trades. We will send them off today. Is this the complete 30-day list?
Regards,
Wendy
 
----- Original Message -----
From: Rudy Armellin
To: wendy@pratthomes.ca
Sent: Monday, July 19, 2010 7:43 AM

Wendy attached is the signed copy of the document that you sent.

 

After speaking with Sean we agreed that the city will on allow us 5 mts and that he would ask the asphalt contractor to pave the driveway just over the 5mts point, hence the note on the document showing 5.3 mts, 1 foot more that the 5 meter rule. Thank you again for all your help.

 

On a different note I was wondering when the followin items are being completed. I don’t want to send my 30 day review to Tarion until I here from you. The thirty day review is this Saturday July 24.

 

NW bedroom door not latching.

Master Bedroom window not opening more that 45 degrees should open to 90 degrees.

Garage door missing upper trim piece to close large gap.

Garage door spring need adjusting door is very difficult to open.

Dining room patches on West wall need painting.

Replacment of main door right side. Door as several small dents and one large dent at top right hand side.

Repair/reinstall missing brick at main entrance right side were it meets the soffit of small roof over main entrance.

 

 

I have taken care of the following items myself.

 

Leaking main water pipe.

Looses cable at furnace.

Carpet seams at master bedroom and on stairs.

 

 

 

 

Regards,

 

Rudy Armellin

Project Manager

 

Panson Electrical Services Ltd.

4 Holland Dr. unit 12

Bolton, Ontario L7E 1G1 

Phone   905-951-6112

Fax      905-951-6177

Email    rudy@panson.ca