From: Diana [dianaazevedo85@gmail.com]
Sent: Monday, August 26, 2013 10:37 AM
To: service
Subject: Pre inspection
Hello Ramona here's the list of things not completed from the pre inspection listDrywall screws under neath kitchen window 
Grooves in wall underneath kitchen window. 
Nail pop outs on kitchen window wall. 
Blemishes on kitchen cabinets.
Seams on moulding in kitchen cabinets. 
Plastic still on handles. 
Corners in walk through from kitchen to living room. 
Screen on sliding door not put in right. 
Window ledge in powder room bathroom needs fixing. 
Powder room door not latching. 
Hardwood trim at stairs scratched and chipped. 
All walls surrounding stair case needs work.
Smaller bedroom has different shades in paint. 
Different shades of paint in basement hallway. 
Nail marks in trim around master bedroom door. 
Master bedroom ledge nail pop outs. 
Master bedroom closet door off track and opposite door is damaged. 
Full bath vanity light fixtures is not straight. 
Left side second and third tile up from floor extruding in bath tub. 
Right top inside corner of tile bath tub extruding. 
Outside door frame to the large storage room chipped on the left hand side and also door does not latch. 
Smaller bedroom door does not latch. 
Toilet handle in powder room bathroom sticks. 
Kitchen cupboards need to be adjusted. 
Drywall over sliding door done incorrectly. 
Main entrance door hinges missing screws. 
Tiles at front door entry chipped. 


Sent from my iPhone

On 2013-08-22, at 3:16 PM, "service" <service@pratthomes.ca> wrote:

Good Afternoon Diana;

 Congratulations on your new Pratt Home. I have keys for you and you can pick them up at our head office on 301 King St. anytime today. I will be in the office until 4:30. Please call me at 705-721-69912 to confirm you will be getting them today.

"The Pratt Homes Legacy Continues..."

Ramona Gross
After Sales Service Department

Head Office
T. 705.721.9912
F. 705.735.6991 
301 King St
Barrie, ON, L4N 6B5
CANADA